Content block block-637232524-1773968068
Body
September 12, 2017 Board of Supervisors Meeting
August 9, 2017 Subdivision Committee Special Meeting
- Public Notice
- VTTM 17341 Staff Report, Map and Supporting Documents
- OCFA Conceptual Fire Master Plan
- OCFA Conceptual Fuel Modification Plan
- Notice of Public Hearing - Deleted Item
- Power Point Presentation
- Cielo Vista Project Area Plan
- Final EIR Notice of Availability
- Cielo Vista - Notice of Preparation
- Cielo Vista - Second (2nd) Revised Public Notice of Availability (NOA) DEIR 615
Cielo Vista Draft EIR 615
- Table of Contents
- Executive Summary
- 1.0 Introduction Draft
- 2.0 Project Description
- 3.0 Basis for Cumulative Analysis
- 4.1 Aesthetics
- 4.2 Air Quality
- 4.3 Biological Resources
- 4.4 Cultural Resources
- 4.5 Geology and Soils
- 4.6 GHGs
- 4.7 Hazards and Hazardous Materials
- 4.8 Hydrology and Water Quality
- 4.9 Land Use and Planning
- 4.10 Noise
- 4.11 Population and Housing
- 4.12 Public Services
- 4.13 Recreation
- 4.14 Traffic - Transportation
- 4.15 Utilities and Service Systems
- 5.0 Alternatives
- 6.0 Other Mandatory CEQA Considerations
- 7.0 List of Preparers
Cielo Vista Draft EIR 615 Appendices
- Appendix A: NOP/NOP Comment Letters
- Appendix B: Air Quality Study
- Appendix C: Biological Resources Assessment
- Appendix D: Cultural Resources Assessment
- Appendix E: Geology Study
- Appendix F: Greenhouse Gas Study
- Appendix G: Hazardous Materials Assessment
- Appendix H: Conceptual Water Quality Management Plan/Hydrology Analysis
- Appendix I: Noise Study
- Appendix J: Public Service and Utility Correspondence
- Appendix K: Sewer Study
- Appendix L: Traffic Study
Cielo Vista DEIR 615 Response to Comments
- Draft EIR Public Notices of Availability
- Cielo Vista EIR - Responses to Comments - complete
- Cielo Vista EIR - Responses to Comments - Appendices complete
- 0.0 Table of Contents
- 1.0 Introduction
- 2.0 Comments and Responses
- 2.A Topical Responses
- 2.B Responses to Individual Comments - Batch 1 (Agency Responses)
- 2.B Responses to Individual Comments - Batch 2 (City Responses)
- 2.B Responses to Individual Comments - Batch 3 (Organization Responses)
- 2.B Responses to Individual Comments - Batch 4 (Individual Responses)
- 2.C Public Hearing Comments and Responses
- 3.0 Corrections and Additions
- 4.0 Mitigation Monitoring and Reporting Program (MMRP)
- Appendix A – Original Comment Letters/Correspondence
- Appendix B-1 – Supplemental Geotechnical Report – Location of Whittier Fault
- Appendix B-2 – Supplemental Geotechnical Report - Discussion of Potential Implications of Subsurface Geological Features
- Appendix B-3 – Measured Ambient Noise Levels
- Appendix C – Fire Behavior Analysis Report
- Appendix D-1 – Conceptual Drainage Study
- Appendix D-2 – Conceptual Water Quality Management Plan